All case studies
La Piadineria

+3.08% accuracy · €7,000 annual savings

La Piadineria

Forecasting challenge at a Milan-area location

We ran a Challenge at a La Piadineria location in the Milan area, comparing operators' manual forecasts with Olivia's advanced model.

Slow, inaccurate manual planning

Ineffective planning: the manual process required excessive time, with a 20.88% error margin in operators' forecasts.

Resource waste: the gap between forecasts and actual demand generated unnecessary costs in procurement and staff management.

Automated advanced forecasting

With Olivia's advanced forecasting system, historical data (sales, customer flow, seasonality) and contextual factors (local events, weather) were integrated.

The model automated planning, offering real-time recommendations.

More accuracy, less time, lower costs

+3.08% forecast accuracy (82.2% vs 79.12% manual).

€7,000 in annual savings thanks to optimized inventory and shifts.

−90% planning time, freeing resources for higher-value activities.